The Levy Group, a leading U.S. apparel manufacturer managing 18 brands, replaced manual workflows and Excel-based BOMs with BlueCherry PLM to improve visibility, accuracy, and speed across its global product lifecycle.

With BlueCherry PLM, the Levy Group:
• shortened development timelines
• improved team collaboration
• automated data flow to ERP
• increased BOM accuracy
• simplified subclass structures from 80 to 5

Download the Case Study